Charles R. Jones

13624 Hartsbourne Drive

Germantown, Maryland 20874

 

Senior Nuclear Project Manager

 

Summary

Nuclear safety project professional for commercial nuclear utilities, NRC and DOE since 1981.  Mechanical system inspector and troubleshooter, applying hands-on nuclear plant experience and MIT graduate engineering degrees.  Lead for engineering and backlog oversight and resolution for DC Cook and Brunswick.  Inspection team member for over 20 team nuclear safety related inspections, specializing in safety system and reactor coolant system issues, plant operations, nuclear safety culture, maintenance programs, and engineering department evaluations.  US Navy Nuclear Propulsion Program, 1966-1981; Nuclear Chief Engineer qualified.  Recently completed Information Systems graduate degree requirements at Johns Hopkins (12/2001).  Documentation editing and production skills.

 

Commercial Nuclear Safety Experience

·         Engineering review team leader at Brunswick, a Watch List BWR with 150 backlogged projects, documenting and prioritizing $250 million in projects, resulting in fastest commercial nuclear power plant recovery.

·         NRC Region 3 support contractor 1998 to 2000 to assess DC Cook engineering issues and safety systems related to the plant’s extended shutdown and recovery; four team inspections (NRC Team Leader was Marty Farber).

·         Team Member for 12 operational and technical design inspections at commercial nuclear power plants.  Served as lead in the different teams to cover operations, maintenance, engineering, and training.

·         Participant in the development of the new risk-informed, performance based NRC Regulatory Oversight Process. (see http://Technidigm.org/Technuke/nuclear.htm)

·         Designed, developed, and implemented as technical lead the NRC Headquarters (Materials) steam generator eddy current inspection report and regulatory oversight support database for 76 pressurized water reactors (PWR), 1996-1997.  Assessed and standardized diverse tube inspection results, summarizing 1600 inspection documents in a master relational database.

·         Technical Lead and primary evaluator to assess Safe Shutdown Fire Protection (Appendix R) responses for all US nuclear power plants, an 18 month DC Cook litigation project for Shaw Pittman.

 

Department of Energy Nuclear Safety

·         Provided support services to convert NRC safety requirements to DOE safety requirements, addressing all SAR functional areas for the New Production Reactor Program and for several Inspection Team guidance projects (1990-1995).

·         Operational Readiness Review Maintenance and Startup Test Group Leader, Savannah River Site K Reactor (1990 - 1991); managed and trained 6 team members in various phases of this critical SRS ORR.

·         Project Technical Engineering Lead to develop the Format and Content Guide for the New Production Reactor Program Safety Analysis Report for both proposed reactor designs to meet life cycle configuration management, safety margin maintenance; reliability, availability, maintainability and inspectability (RAMI), 1990.

·         Member, Safety Analysis Report Review Team, Rocky Flats Plutonium Laboratory, maintenance and auxiliary systems lead, 1991.

·         National Laboratory Technical Safety Assessment Team Member, maintenance and auxiliary systems: Argonne-East, Oak Ridge, Lawrence Livermore, and Lawrence Berkeley
(1990-1991); performed technical assessments of about 100 laboratory buildings for auxiliary systems and maintenance.

·         Operational Readiness Review Team Member, Hanford T Plant (Fluor Hanford waste processing self assessment); lead for Procedures and Conduct of Operations; Hazard Category Upgrade and readiness to move and store Shippingport Spent Fuel Assemblies (2002).

·         Consultant for technical safety review, Hanford High Level Waste Tank Program remediation submittals to DOE/HQ (EH) for one year (1994-1995).

·         Rocky Flats Plutonium Laboratory Operational Readiness Review, Maintenance and Training (1991).

·         Rocky Flats Criticality Safety Assessment Physical Plant Systems Inspector and Team Coordinator (1989).

·         Technical Lead, multifunctional approaches, facility assessment program development for DOE/HQ (DP, EH/NS, and EM), 1990-1995.

 

US Navy Nuclear Propulsion Reactor Experience

·         COMNAVSURFPAC Nuclear Propulsion Mobile Training and Inspection Team; chemistry and radiological controls; Nuclear Chief Engineer Candidate instructor for Pacific Fleet
(3 years).

·         USS Nimitz CVN68 New Construction Reactor Systems inspector; Reactor Controls Division Officer; Reactor Mechanical Assistant Department Head; Chief Engineer Qualification; EOOW Qualification A4W/A1G (3 years).

·         USS Enterprise CVN65, Reactor Mechanical Division Officer; Refueling and Overhaul Officer for two reactors; EOOW Qualifications on A2W and A3W (3 years)

·         USS Bainbridge, CGN25 (2 years); Operations Officer; EOOW Qualification D2G (2 years).

·         Nuclear Power School and Nuclear Plant Prototype, EOOW Qualification D1G
(1 year).

 

Education

M.S., Information and Telecommunications Systems for Business, Johns Hopkins University

M.S., Mechanical Engineering, Massachusetts Institute of Technology

O.E., Ocean Engineering Professional Degree, Massachusetts Institute of Technology

B.S., Mechanical Engineering, United States Naval Academy

 

Clearance

Department of Energy Q

Computer Software Experience

MS Word, Excel, PowerPoint, Access, Visio, Project; various graphics software;
Interactive Web Pages (html/cgi scripts)